After almost 3 months they've finally started on replacing the flooring.
Today they're doing my sons bedroom and the hallway/passage, tonight we'll get his bed etc. out of the back bedroom and into his own room, unfortunately we'll also have to squeeze in the sofa bed (which my daughter uses when she visits) and everything else!.
Tomorrow they'll rip up the back bedroom flooring and possibly the kitchen as well, then stick the dehumidifier on (yet again) to dry them out over the weekend. Once the back bedroom is re-floored I'll have to move all of my living room (which is really my bedroom as well) into there, that will take a lot of doing, probably most of a day.
Couple of bits of the flooring aren't good, where it goes past the kitchen doorway and passage cupboard, I'm assuming they'd be locking the kitchen and cupboard floors into them.
OK, off to get shifting more stuff around.